Quote:
Originally Posted by WillH
Speaking of which what will cutting Lloyd do to that $27.6 (under) number?
|
Cutting Lloyd would cost us $2.9 million in 2008 cap space.
So if we did make every one of those moves and get all the way to $27.6 under the cap (won't happen but let's go with it), then cutting Lloyd would leave us with $24.7 million in space.